Engineer Testing Commissioning Electrical Switchgear Panel PT Borneo Energi Bersaudara Kalimantan
📋 Pilar 4 — Testing Lapangan & Proteksi Sistem

Testing & Commissioning
Electrical On-Site

Pengujian diagnostik listrik lapangan oleh engineer bersertifikat — proteksi relay, power quality, partial discharge, hi-pot, commissioning switchgear MV/LV. Standar IEC 61850 & IEEE C37. Melayani seluruh Kalimantan, Sulawesi, dan kota industri Papua.

200+Proyek Selesai
15+Jenis Pengujian
24/7Emergency Respons
IECCertified Std
testing commissioning electrical Balikpapan proteksi relay Kalimantan commissioning switchgear MV Samarinda partial discharge test Bontang power quality analyzer Sulawesi uji commissioning trafo Papua relay protection testing tambang hi-pot test switchgear 20kV commissioning PLTU PLTG Kalimantan earth resistance test industri IEC 61850 relay testing acceptance test panel MV LV
Mengapa Penting?

Testing & Commissioning: Jaminan Keandalan Sebelum Operasi

Sistem kelistrikan yang tidak diuji secara benar adalah bom waktu. Commissioning yang tepat mencegah kegagalan katastrofik, menjamin keselamatan kerja, dan memastikan sistem beroperasi sesuai desain.

🛡

Keselamatan Operasi

Proteksi relay yang salah setting dapat gagal memutus gangguan — menyebabkan busur api (arc flash), kebakaran, atau kerusakan peralatan senilai miliaran. Testing memastikan proteksi bekerja sesuai setting koordinasi.

✅

Validasi Desain

Commissioning membuktikan bahwa instalasi sesuai gambar as-built, setting relay sesuai koordinasi studi, dan seluruh interlocking berfungsi — sebelum sistem diserahkan ke operator untuk beroperasi komersial.

📈

Kualitas Daya (Power Quality)

Harmonik, voltage dip, flicker, dan unbalance bisa merusak motor, VSD, dan peralatan sensitif. Power quality analysis mengidentifikasi dan menyelesaikan masalah sebelum merugikan produksi.

📄

Dokumentasi & Kepatuhan

Laporan commissioning adalah dokumen legal untuk PLN sambungan daya, asuransi peralatan, dan audit HSSE. Dokumen kami terstruktur sesuai standar IEC dan persyaratan PLN / pihak ketiga.

Layanan Pengujian

Jenis Testing & Commissioning Electrical yang Kami Lakukan

Tim insinyur kami memiliki kompetensi pengujian menyeluruh untuk sistem distribusi tegangan menengah dan rendah.

📋

Relay Protection Testing

Pengujian dan setting relay proteksi overcurrent, earth fault, differential, distance, dan reverse power — menggunakan injection tester standar IEC 60255. Koordinasi relay sesuai studi proteksi.

  • ✓OCR / IDMTL relay setting & test
  • ✓Differential relay (87T, 87M, 87G)
  • ✓Distance relay zone setting
  • ✓Earth fault / REF relay
  • ✓Secondary injection test IEC 60255
⚡

Commissioning Switchgear MV/LV

Commissioning panel switchgear tegangan menengah (6kV – 20kV) dan tegangan rendah — termasuk pengujian mekanik, interlocking, trip test, dan energize pertama kali.

  • ✓Pre-commissioning inspection (IR, insulation)
  • ✓Mechanical & interlocking test
  • ✓CT / PT ratio & polarity test
  • ✓Trip & close coil function test
  • ✓First energize & load test
🔋

Partial Discharge (PD) Testing

Deteksi partial discharge pada kabel MV, switchgear GIS, dan transformator daya — menggunakan metode offline (VLF) dan online PD monitoring tanpa shutdown sistem.

  • ✓VLF PD test kabel 6–20kV
  • ✓Online PD monitoring (HFCT, TEV)
  • ✓GIS / AIS switchgear PD test
  • ✓Lokalisasi titik PD (UHF method)
  • ✓Laporan PRPD pattern analysis
📉

Power Quality Analysis

Analisa kualitas daya listrik sesuai standar IEC 61000 — harmonic, voltage sag/swell, flicker, unbalance, dan transient — untuk industri dengan VSD, UPS, dan beban non-linear sensitif.

  • ✓THD (harmonic distortion) IEC 61000-4-7
  • ✓Voltage sag / swell / interruption
  • ✓Flicker measurement IEC 61000-4-15
  • ✓Power factor & unbalance analysis
  • ✓Load profiling & monitoring 7 hari
🔥

Hi-Pot & Insulation Testing

Pengujian tegangan tinggi (hi-pot) dan resistansi isolasi untuk kabel MV, switchgear, trafo, dan motor — sesuai standar IEC 60060 dan IEEE 400.

  • ✓AC Hi-Pot test (30–100 kV)
  • ✓DC Hi-Pot & leakage current
  • ✓VLF (Very Low Frequency) 0.1 Hz test
  • ✓Insulation resistance (megger) PI & DAR
  • ✓Cable withstand test sesuai IEC 60229
🌎

Earth Resistance & Grounding Test

Pengukuran tahanan pentanahan (earth resistance) sistem grounding substation, tower, dan fasilitas industri — sesuai standar IEEE 80 dan IEC 60364-5-54.

  • ✓Fall-of-potential method
  • ✓Clamp-on earth tester (tanpa disconnect)
  • ✓Soil resistivity measurement (Wenner)
  • ✓Step & touch voltage check
  • ✓Grounding grid audit & rekomendasi
Peralatan Uji

Instrumen Testing Berstandar Internasional

Semua instrumen dikalibrasi traceable ke standar nasional — hasil uji dapat dipertanggungjawabkan secara teknis dan legal.

📋
Relay Injection Tester
Omicron CMC 356 / CMC 353
Secondary injection untuk semua jenis relay proteksi — OCR, differential, distance, bus bar protection
🔋
PD Detector
Megger PDS 60 / HVPD
Deteksi partial discharge pada kabel MV, switchgear, GIS — PRPD pattern analysis & lokalisasi
📉
Power Quality Analyzer
Fluke 435-II / 1760
Analisa harmonic THD, sag/swell, flicker, unbalance — logging 7 hari sesuai IEC 61000
⚡
AC / DC Hi-Pot Tester
Megger / Haefely / Sefelec
Hi-pot test 1 – 100 kV AC/DC — kabel, switchgear, trafo, motor HV
🔥
VLF Tester
Baur PHG 70 / Megger VLF
VLF 0.1 Hz hi-pot test untuk kabel XLPE MV — lebih aman dibanding 50Hz hi-pot untuk kabel panjang
🔬
Megger / Insulation Tester
Megger MIT 1025 / Fluke 1550C
Megger test IR, PI, DAR — 1 kV s/d 15 kV test voltage untuk motor HV dan kabel
🌎
Earth Resistance Tester
Kyoritsu 4105A / Megger DET4TC2
Fall-of-potential & clamp-on method — pengukuran tahanan grounding sampai 0.001 Ω
📄
CT / PT Analyzer
Omicron CPC 100 / Vanguard
Rasio, polaritas, magnetizing curve, burden test — CT & PT untuk proteksi dan metering
Acuan Standar

Standar Internasional yang Kami Acu

Semua prosedur pengujian mengacu standar IEC, IEEE, dan PLN — laporan kami dapat diterima oleh auditor, insurer, dan regulator.

Jenis PengujianStandar AcuanLingkup
Relay Protection TestingIEC 60255 IEEE C37.90OCR, differential, distance, REF, busbar relay
Switchgear CommissioningIEC 62271 IEC 60694MV/HV switchgear, CB, disconnector, earthing switch
Partial DischargeIEC 60270 IEC 60664Kabel MV, GIS, transformator, switchgear
Power QualityIEC 61000-4-7 IEC 61000-4-15Harmonik, sag/swell, flicker, unbalance, transient
Hi-Pot / Dielectric TestIEC 60060 IEEE 400Kabel XLPE MV, switchgear, trafo, motor HV
Earth ResistanceIEEE 80 IEC 60364-5-54Grounding substation, tower, fasilitas industri
CT / PT TestingIEC 61869 IEEE C57.13CT metering & proteksi, VT ratio & polarity
Insulation ResistanceIEEE 43 IEC 60085Motor, trafo, kabel, switchgear — IR, PI, DAR
Alur Kerja

Tahapan Testing & Commissioning PT BEB

01

Scope & Review

Review gambar as-built, studi proteksi, single-line diagram — tentukan scope uji dan prosedur

02

Pre-Energize Check

Inspeksi visual, insulation resistance, continuity, CT polarity — sebelum sistem dienergize

03

Injection & Functional Test

Secondary injection relay, trip test CB, interlock check, close/open coil function

04

Energize & Load Test

First energize, load ramp test, power quality monitoring, thermal scan switchgear

05

Laporan & Serah Terima

Laporan commissioning lengkap — data uji, setting sheet, snag list, punch-list clearance

Commissioning switchgear MV industri Kalimantan Sulawesi Papua - layanan PT BEB

Tim Insinyur Berpengalaman — Siap On-Site

Engineer kami berpengalaman di proyek PLTU, tambang, smelter, dan PKS di seluruh Kalimantan dan Sulawesi. Mobilisasi cepat, laporan terstruktur.

Jadwalkan Sekarang

Area Layanan Testing & Commissioning

Mobilisasi tim engineer ke seluruh wilayah industri — on-site electrical testing & commissioning

Kalimantan Timur
Balikpapan, Samarinda, Bontang, Sangatta, Berau, Penajam, Kutai Timur, Kutai Kartanegara
Kalimantan Selatan
Banjarmasin, Banjarbaru, Kotabaru, Batulicin, Rantau, Tabalong, Pelaihari, Marabahan
Kalimantan Tengah
Palangkaraya, Sampit, Pangkalan Bun, Muara Teweh, Kasongan, Kuala Kapuas
Kalimantan Barat
Pontianak, Singkawang, Ketapang, Sintang, Sanggau, Mempawah, Nanga Pinoh
Kalimantan Utara
Tarakan, Tanjung Selor, Nunukan, Malinau, Bulungan, Sebatik
Sulawesi Selatan
Makassar, Parepare, Sorowako, Luwu, Bantaeng, Bone, Pinrang, Palopo
Sulawesi Tengah
Palu, Morowali, Tolitoli, Banggai, Luwuk, Poso, Parigi, Donggala
Sulawesi Utara & Tenggara
Manado, Bitung, Gorontalo, Kendari, Kolaka, Konawe, Muna, Bau-Bau
Papua — Timika & PTFI
Timika, Tembagapura, Poumako — area Freeport Indonesia & kontraktor EPC
Papua Barat — Sorong
Sorong, Manokwari, Fakfak, Bintuni — migas LNG, industri maritim & energi
Papua Tengah & Selatan
Nabire, Merauke, Boven Digoel — perkebunan, agroindustri & PLN Papua
Papua Utara — Jayapura
Jayapura, Sentani, Arso — PLN Papua, infrastruktur publik & perkantoran
Klien Industri

Industri yang Membutuhkan Testing & Commissioning Electrical

Setiap industri dengan sistem distribusi MV/HV, switchgear, dan proteksi relay membutuhkan commissioning yang benar.

Pembangkit Listrik — Kalimantan
PLTU Kariangau Balikpapan · PLTU Embalut Kukar · PLTU Asam-Asam Kalsel · PLTG Tanjung Batu Bontang · PLTD PLN Kalbar · PLTA Kayan Kaltara · Captive Power KPC & Adaro
Pertambangan & Smelter
KPC Sangatta · Adaro Tabalong · Berau Coal · PT Vale Sorowako · IMIP Morowali · PT GNI Morowali Utara · Virtue Dragon Konawe · PTFI Timika · Antam Pomalaa
Minyak & Gas
Pertamina RU V Balikpapan · Badak NGL Bontang · Total E&P Mahakam · Medco Energi · Vico Indonesia · PHE OSES · Tangguh LNG Bintuni · PHM Mahakam
Pupuk & Petrokimia
Pupuk Kalimantan Timur (PKT) Bontang · Pupuk Iskandar Muda · KIE Bontang · Industri Kimia Kaltim · PT Kaltim Prima Coal · Kaltim Parna Industri
Pabrik Kelapa Sawit & Agroindustri
Wilmar Kalimantan · Musim Mas · Astra Agro Lestari · SMART Sinar Mas · BW Plantation · Sawit Sumbermas Kalteng · Salim Ivomas · Sampoerna Agro
PLN & Infrastruktur
PLN UIW Kaltim · PLN UPT Samarinda · PLN Papua · PLN Sulsel · GI 150kV Balikpapan · GI 150kV Samarinda · Proyek IKN Penajam · PLN Distribusi Kalsel
Jangkauan Wilayah

Jasa Testing & Commissioning Electrical — Seluruh Kalimantan, Sulawesi & Papua

Kalimantan Timur: Testing commissioning electrical Balikpapan, relay protection test Samarinda, commissioning switchgear MV Bontang, PD test kabel Sangatta KPC, power quality analysis Berau, commissioning panel MV Penajam IKN, earth resistance test Kutai Timur, hi-pot test switchgear Kutai Kartanegara, acceptance test PLTU Kariangau, relay testing PLN Kaltim.

Kalimantan Selatan: Testing commissioning electrical Banjarmasin, relay protection Banjarbaru, commissioning panel Kotabaru, earth test Batulicin, power quality Rantau, PD test switchgear Tabalong Adaro, commissioning PLTU Asam-Asam, hi-pot test kabel MV Kalsel.

Kalimantan Tengah & Barat: Commissioning electrical Palangkaraya, relay test Sampit, testing panel MV Pangkalan Bun, power quality PKS Kalteng, commissioning Pontianak, relay protection Ketapang, earth resistance test Sintang, acceptance test switchgear Sanggau.

Sulawesi Selatan & Tengah: Testing commissioning Makassar, relay protection Vale Sorowako, commissioning panel IMIP Morowali, PD test switchgear Palu, power quality PT GNI Morowali Utara, earth test KIBA Bantaeng, relay testing smelter nikel Sulawesi, commissioning PLTU Sulsel.

Sulawesi Utara & Tenggara: Testing commissioning Manado, relay protection Bitung, commissioning panel Kendari, earth resistance Kolaka Antam, power quality Konawe Virtue Dragon, commissioning switchgear Gorontalo, acceptance test PLN Sulawesi.

Papua: Testing commissioning PTFI Timika Freeport, relay protection Tembagapura, commissioning switchgear Sorong, earth resistance test Manokwari, PD test Fakfak migas, acceptance test Bintuni Tangguh LNG, commissioning panel Merauke, relay protection PLN Papua Jayapura.

FAQ

Pertanyaan Umum Testing & Commissioning Electrical

Apa perbedaan testing, commissioning, dan acceptance test?

Testing = pengujian komponen individual (relay, CB, kabel, trafo) sesuai standar pabrikan dan IEC/IEEE. Commissioning = pengujian sistem secara terintegrasi — memastikan semua komponen bekerja bersama sesuai desain. Acceptance Test = pengujian formal yang dilakukan bersama pemilik proyek (owner) untuk serah terima sistem — biasanya menghasilkan dokumen punch list dan FAT/SAT report.

Berapa lama commissioning switchgear MV 6 feeder?

Switchgear MV (6kV – 20kV) dengan 6 feeder: estimasi 3–5 hari kerja — termasuk pre-energize check, relay injection test, CT test, interlocking test, dan first energize. Panel LV + MCC: 2–3 hari. Substation lengkap (trafo + MV + LV + relay): 5–10 hari. Durasi bergantung kompleksitas sistem proteksi dan scope pengujian.

Apakah relay protection test bisa dilakukan tanpa mematikan sistem?

Secondary injection test (paling umum) dilakukan dengan koneksi ke terminal sekunder CT/VT — tanpa perlu de-energize trafo atau bus. Hanya CB perlu ditrip dalam kondisi de-energized untuk safety. Primary injection test memerlukan sistem dimatikan sementara. Partial discharge test dan power quality monitoring bisa dilakukan online tanpa shutdown.

Dokumen apa saja yang dihasilkan dari commissioning?

Laporan commissioning PT BEB mencakup: (1) Pre-commissioning checklist, (2) Test record per peralatan dengan data aktual vs acceptable limit, (3) Relay setting sheet (as-tested vs as-designed), (4) CT/PT test certificate, (5) Insulation resistance log, (6) Earth resistance measurement report, (7) Punch list / snag list dengan status clearance, (8) Commissioning certificate — siap untuk arsip HSSE dan PLN.

Apakah PT BEB melayani testing commissioning di Papua dan Sulawesi?

Ya. Tim kami secara reguler melayani Papua (Timika — area PTFI & kontraktor EPC, Sorong — migas, Jayapura — PLN Papua), Sulawesi Selatan (Makassar, Sorowako Vale, Bantaeng smelter), dan Sulawesi Tengah (Morowali — IMIP & GNI, Palu). Mobilisasi via jalur udara — SLA 2–3 hari dari konfirmasi PO. Biaya mobilisasi disesuaikan lokasi.

Standar apa yang digunakan untuk relay protection testing?

IEC 60255 (relay measuring relays), IEEE C37.90 (relay for AC electric power apparatus), dan manual OEM relay bersangkutan (Schneider SEPAM, ABB REF, Siemens SIPROTEC, GE Multilin, Alstom MiCOM, dll). Prosedur test kami mengacu test plan yang dibuat berdasarkan protection study dan setting sheet yang disetujui engineer proyek.

Butuh Testing & Commissioning Electrical?

Tim insinyur PT Borneo Energi Bersaudara siap mobilisasi ke lokasi proyek Anda di Kalimantan, Sulawesi, dan Papua. Laporan resmi, prosedur IEC/IEEE, respons cepat.

commissioning PLTU KPC Sangatta relay protection test PTFI Timika testing switchgear Vale Sorowako PD test IMIP Morowali commissioning Pertamina Balikpapan power quality Badak NGL Bontang earth resistance test PKS Kalimantan hi-pot test PLN Kaltim relay testing Adaro Tabalong commissioning GNI Morowali acceptance test smelter nikel Sulawesi testing commissioning panel Papua industri